Monday, July 20, 2009

Outstation Project

Sorry for not post any project this few week because busy for my outstation project

1) ON 19 JULY

Visit Negeri Sembilan Project . This is standalone project.
Spec :-
- Size = 19 X 75
- 3 Storey
- design with open roof.

2) ON 26 JULY

Visit Sarawak Project. Have few project at Sarawak . Will be there until 28 July.
Spec:-
- Standalone Project
- size = 30 x 80 feet
- Design with open roof.

3) ON 30 JULY

Visit Kelantan Project.
Spec:-
- Standalone Project
- Size = 25 x 75 feet
- Design with Dog Kernel.

For those who want to meet me during the outstation, please give me a call. 012-5530071

New standalone project at Kedah

1) Near Alor Janggos. Abut 15 minutes for alor setar.
Spec:-
- Standalone Project
- Size = 19 x 56 feet
- 3 Storey
- Design with open roof.

2) Near Langgar town. About 10 minutes for alor setar.
Spec:-
- Standalone Project
- Size = 19 x 37 feet
- 3 Storey
- Design with open roof.
( This is a very small BH and the cost is very very low. SMS me if you want to know the total price !!

Sunday, June 14, 2009

Aroma

Sorry, my English is very bad !!! Please forgive me for the spelling error . !!!!

During the renovation or construction period, our BH with have a lot of unwanted smell such like smoking , semen and cooking smell. To remove this unwanted smell , you can try this:-

1) Burn some core ( Arang Kayu ) inside this BH.
Advantage : can remove all the cement smell.
Disadvantage : will cause the BH rh drop until 20 to 30 %.

2) Put some pineapple inside this BH.
Advantage : can remove part of the cement smell. Can produce fruit fly.
Disadvantage : can lure unwanted animal or insect.

3) 3 day before switch on the sound, put some bird dropper in a small container, then add some water + some ammonia.

Thursday, June 11, 2009

Jakarta Seminar

Pak Hen Seminar Again. For those who want to joint this seminar can sms me or email me. We will be there on 7 Aug until 10 Aug 2009 at Jakarta.
Our flight IS
7 AUG 2009
FROM PENANG is QZ7669 ( 1045 AM )
TO JAKARTA ( 1205 PM )

BACK
10 AUG 2009
FROM JAKARTA QZ 7669 ( 0655 AM )
TO PENANG ( 1020 AM )



Wednesday, June 10, 2009

KG Sanglang Project

Standalone Project

Size : 19 x 56 feet x 3 storey ( 9 feet high )
Design : open roof

Will open sound on 1 July 2009

Construction Period :
Start 29 April 2009
Finish 10 Jun 2009
TOTAL 45 DAY

PRICE : xxx,xxx.xx email me to know the price ( wc_tan2002@yahoo.com)
Not more then RM200,000.00








Sound

New ideal 2

( Playing The SOS sound )

This few week, i try to do some experiments on the sound system. At 7 pm, during the bird is coming back, i close all the external sound but switch on the SOS sound. But remember, this SOS sound should play with different tweeter on the roof top about 10 feet from the entrance.

Why ?
This can attract many bird flying on the top of the BH. I try playing this SOS until 730 pm, then i close this sound and switch on the external sound.

This is just a experiments , i still need some time to see the result. If the result is good, then we can try it at the old BH to increase the population.

Tuesday, June 9, 2009

BELIEVE IT OR NOT

Sorry for not post new article this few week.

New ideal on swiftlet farming 1

( Kill the swiftlet )
Today i hear from a local swiftlet farmer that told me about his experience on swiflet farming. This friends have few shop lot design swiftlet farm. One of his project only have 1 nest after 2 year. His already ask many consultant to help him but after the modification , the qty of the nest still same. His very angry about this result so one night , he go in this BH and close the entrance and kill this bird. After he kill this bird, he just close the door and switch on the sound back to the original stage. After few month, when he enter this bird house, he very happy because have about 50 nest in this BH without doing any modification. After 2 year, this BH already can get about 1 to 2 kg per month.

From his experience, he told me that maybe this bird is the king or ( samseng ). This bird do not allow any new bird to go in this BH, so no matter what he do in this BH, the result still the same but after he kill this bird , the population is increasing.

So, believe it or not ???

Sunday, May 3, 2009

April and May Bird House Project Progress

Below is the project that we already finish in April and progress bird house. Still have few project that can not post in this blog due to safety problem.

8) Kg Sanglang. Standalone. Size 19 X 56 feet. 3 Storey. Will finish this project in 2 month.

7) Padang Sera project. Still progress. will finish in 2 more month.
6) Kuala Sungai project. Still progress. Building will finish on Jun.
5) Kerpan Project. Already switch on the sound for 30 days. Refer to CCTV, already have new bird over night in this new project.
4) Juru Project. Standalone. Size 30 X 100 feet . 2 storey. Design with open roof.


3) JItra project. Shop lot. Size 20 X 60 feet. Just switch on the sound system last week.



2) Air Hitam project. Stand alone . Size 40 X 100 feet. 4 storey.


1) Alor Setar ( Shop Lot ) size 20 X 70 feet . Design with dog karnell.