Tuesday, April 7, 2009

This Month Project Progress

Still have few project at Juru, Perak, And Perlis. However i still can not post the pictured. I will post the pictured later.
For those who want to visit our project during the progress, please give me a call 012-5530071

Last week, we just visit few of our 3 month old BH:

BH 1 : Alor Setar shop lot ( only About 110 days ) Mr Lim is with me during this visit, From the pictured, you can saw a lot of bird dropper is on the floor.
From the pictured, you can saw at the corner already have 6 nest. Include 1 finish nest.
Below is the pictured for this month.

1)Jitra Project. Shop lot with size 20 X 70 feet. Design with open roof.



2)Kuala sungai Project. Stand alone with size of 40 feet X 100 feet X 4 storey. This project is using open roof design.

3)Padang Sera Project. Stand Alone with size 30 feet X 100 feet X 4 storey. This project is using Dog Kernel design.


Last Month Project

1) Bukit Minyak

Already switch on the sound on 26/03/2009. After wait for 10 minute, already have few bird fly into this BH. The day after switch on the sound, i get a call from a local friends that told me already have few bird are playing at this BH. Hope this new bird can stay in this BH. I will go to verify it after 30 days. Below is the Bukit Minyak Project Pictured.
2) Nibong Tebal Project

I just helping the owner to attach more tweeter in his BH. Below is the pictured of this project


3) Jawi Project
4 & 5 ) 2 project at Alor Setar Project


6 & 7 & 8 ) Padang Sera and Kuala Sungai Project still on progress. Kerpan project already switch on the sound. Got a lot of bird is flying in and out this project. Hope can see the nest marking in 3 month.