This trip need to verify 4 bird house project.
On 17 / 09 / 2009
1) At Batang Kali - Shop Lot. I need to do same test and get the final data before convert this shop lot into bird house.
2)At Rawang - Factory lot. Already finish the conversion work. Just wait for me to switch on the sound.
On 18 / 09 / 2009
3) Melaka - Stand alone project. I need to verify the land and the design of this Bird House. At the same time , The owner also need me to do same test on the land that he going to start his project.
4) Kajang - Shop lot project. Just switch on the sound about 3 week. According to the owner, already have few bird that fly in and out at this bird house. I will pass by Kajang, so i will stop by to verify the sound system.
Tuesday, September 15, 2009
Sunday, September 6, 2009
This month Bird House Project
LAST MONTH RESULT
On 7 / 09 / 2009 until 10 / 09 / 2009
To Sarawak - Will be at Kuching to Verify few project.
On 17 / 09 / 2009 until 18 / 09 / 2009
To KL - Will be at KL to verify 3 week old bird house and going to switch on one more shop lot bird house. Besides that, i going to verify a new shop lot project near Batang Kali and help the owner to design and do some test at his shop lot.
On 23 / 09 / 2009 until 28 /09 /2009
To Sarawak - Will start to connecting one stand alone project. This standalone size is 30 X 80 feet.