After few week busy to convert this shop lot into bird house, finally, all is ready and tomorrow we are going to switch on the sound. This shop lot is about 15 year old already. Before we convert it, the internal temperature is 34 to 38 and the humidity is about 50 to 70 only. After we modify it, we manage to reduce the temperature to 27.7 until 29.1 . This data is collected for 1 week time. So, after getting all the data, we decide to operate this BH tomorrow. I will post the latest pictured of this BH to your tomorrow.
This BH is located about 15 minute from alor setar town. The size of this BH is about 20 feet by 70 feet. We design this BH with open roof design to reduce the sound pollution. I am using 3 power amp in this BH. 2 is internal sound and 1 more is external sound. I am using the baby swiftlet sound for the internal and the external i using the polling sound and the baby sound of cause i add some adult sound in this CD. I hope it can manage to attract more bird to this BH.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment