Sorry for not post any pictured this few week due to very busy and my internet got problem.
This month we have 8 progress bird house.
1) Bukit Minyak - Shop lot. 2 storey. Just finish modify the building and now is rewiring the tweeter. Will start to switch on the sound end of this month.
2) Nibong Tebal - Shop lot. 2 storey. Just helping the owner to adjust the sound system and place more internal tweeter. Will finish end of this month also.
3) Jawi- Stand Alone. 3 storey . Size is 20 X 80. Already finish this building 8 month ago but got problem with the TNB. Just get the electrical supply last week. Going to start connect the sound system. Will finish on the end of this month.
4) Alor Setar - Tmn Crytal , Shop lot. 1 storey. Already finish on modify the building. Now just run the sound testing only.
5) Alor Setar - Factory lot. Top floor. Just start to convert and modify the top floor. Just get the temp before modify. toooo hot 39 !!!. Still trying to modify and try to reduce the temp.
6) Padang Sera -Stand Alone . Just start this project few day ago. The size of this building is 30 X 100 for 4 1/2 storey. I will post the pictured soon.
7)Kuala Sungai Project- Stand Alone
This is one of the bigger project with the size is 40 feet X 100 feet for 4 story. Will finish in 7 month.
Kerpan Project
Ah Pak just use about 2 month time, this project already finish.
We are now getting the data now but the temp is too high due to high of this building only 6 to 7 feet. We still adjust it to make sure that the temp is on the right value.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment