Tuesday, April 7, 2009

This Month Project Progress

Still have few project at Juru, Perak, And Perlis. However i still can not post the pictured. I will post the pictured later.
For those who want to visit our project during the progress, please give me a call 012-5530071

Last week, we just visit few of our 3 month old BH:

BH 1 : Alor Setar shop lot ( only About 110 days ) Mr Lim is with me during this visit, From the pictured, you can saw a lot of bird dropper is on the floor.
From the pictured, you can saw at the corner already have 6 nest. Include 1 finish nest.
Below is the pictured for this month.

1)Jitra Project. Shop lot with size 20 X 70 feet. Design with open roof.



2)Kuala sungai Project. Stand alone with size of 40 feet X 100 feet X 4 storey. This project is using open roof design.

3)Padang Sera Project. Stand Alone with size 30 feet X 100 feet X 4 storey. This project is using Dog Kernel design.


1 comment:

Olive Tree said...

Hi, it's a very great blog!
I could tell how much efforts you've taken on it.
Keep doing!