Saturday, November 22, 2008

Progress....

After Ah Pak Checking, the worker is putting all the steel frame into the brick frame and Ah Pak steel monitor the wooden frame to make sure all the work are done and in the good condition. Now all the base work is finish and just need to concrete it on this Monday 24 Nov 2008. The first floor will be finish on this 30 Nov 2008 if the weather is good. After all the steel frame is finish connecting, Ah Pak need to check it one by one before putting it into the beam frame.

Ah Pak is monitoring the worker to connect all the steel before putting the steel frame into the beam frame.
The worker is doing the brick frame.